Elementos - Tin Tails Retreat Project

Service: Pre-Feasibility Study (PFS) – Cost Estimation and 3D Plant Modelling

Elementos Tin Tails Retreat Project

Mincore, in conjunction with HOWCAM, prepared a PFS-level study and report, including a ±30% capital and operating cost estimate and a 3D plant model for the Tin Project in Tasmania. Refer to Mincore Studies Factsheet for study-level detail and guidelines.

EMT_500x300.jpg

Top